Outdoor Designs has asked the South Saunders H.O.A. Board to share the following message with South Saunders residents.
A Gopher One call has been ordered for marking a small 5 foot radius of each mailbox stand for utilities underground.
This will probably take at least 3 days for them to do all the stands.
Please ask residents to leave flags and markings in “tact” until we have installed the new stands. Otherwise we will need to do new locates and that will slow us down an additional 3 days.
The mailboxes themselves are on their way to us via Yellow Freight and should arrive this week. We are prepared to start installing after the area is “marked” for utilities, and the mailboxes are “lettered” and assembled.
We will be doing the install over two, possibly three days, depending on the weather.
We will keep you posted.
Sincerely,
Outdoor Designs